Tweet |
Custom Search
|
|
|
||
TM 55-1905-220-14-6
3-123.1. SLACK CABLE INTERLOCK LIMIT SWITCH - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
3. Insert screws (14).
Hand tight;
then torque to
10-15 in. lbs.
(1.138-1.706
Nm). Torque
screws in a
staggered
pattern (from
one side of
cover to the
other).
b. Wiring
1. Thread wiring (12)
(12)
through housing (18).
2. Connect wiring (12)
Remove tags.
to contact block (13).
3-2059
|
||