TM 55-1905-221-14-1
3-13. SEA WATER PIPING.
This task covers:
a. Inspection
b. Service
INITIAL SETUP :
Equipment
Condition
Paragraph
Condition Description
Test Equipment
NONE
NONE
Tools and Special Tools
Special Environmental Conditions
General Mechanic Tool Kit
NONE
Material/Parts
General Safety Instructions
Clean Cloths
NONE
Detergent
Personnel Required
Troubleshooting Reference
Operator-Crew
NONE
(MOS 61B & C)
References
Approximate Time Required (minutes)
NONE
Inspection
30
Service
30
3-25