TM 55-1905-221-14-1
3-13. SEA WATER PIPING (Continued).
LOCATION/ITEM
ACTION
REMARKS
INSPECTION
1. Sea Water
a. Inspect flexible hose (1 and
Piping
2) for cuts, breaks or leaks.
b. Inspect flexible hose (3 and
4) for cuts, breaks or leaks.
c.
Inspect piping (5 and 6) for
breaks or leaks.
d. Report any defects to your
supervisor.
3-26