Tweet |
Custom Search
|
|
|
||
TM 55-1905-221-14-2
RAMP HOIST CONTROL VALVE (Continued).
LOCATION/ITEM
ACTION
REMARKS
REASSEMBLY (Cont)
(2) Install studs (7) and
Install spacers
nuts (6).
to insure
against spool
bind when studs
are tightened.
Torque stud nuts
to 45-50 lb. ft.
(61.- 67.8 Nm)
(3) Install levers (5),
link (4), "E" rings
(3), fulcrum rod (2),
and "E" rings (1).
5-91
|
||