Tweet |
Custom Search
|
|
|
||
TM 55-1905-221-14-2
5-24. MUFFLER AND EXHAUST PIPING.
This task covers:
a. Removal
c. Replace/Repair
b. Repair
d. Installation
INITIAL SETUP
Test Equipment
References
NONE
NONE
Special Tools
NONE
Equipment
Tools
Condition Condition Description
General Mechanic's Tool Kit
NONE
NSN 5180-00-629-9783
Welding set
Protective clothing
Respirator
Safety goggles
Materials/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
MOS 61C10, 44E
Observe WARNING in procedure.
LOCATION/ ITEM
ACTION
REMARKS
WARNING
ALL PIPING AND EXHAUST LINES SHALL BE TREATED AS BEING INSULATED WITH ASBESTOS
MATERIAL. PROTECTIVE CLOTHIN G AND RESPIRATORS SHALL BE WORN AT ALL TIMES
WHEN HANDLING SUSPECT ASBESTOS-COVERED PIPING AND EXHAUST LINES.
IF ENGINES HAVE BEEN RUNNING, MAKE SURE EXHAUST SYSTEM HAS COOLED
SUFFICIENTLY PRIOR TO PERFORMING ANY MAINTENANCE. IMPROPER HANDLING COULD
RESULT IN SERIOUS BURNS TO PERSONNEL.
5-470
|
||