Custom Search
 
  
 
TM 55-1905-221-14-2
5-24.
MUFFLER AND EXHAUST PIPING (Continued).
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION (Cont)
k. Position flexible connection
Use new gaskets.
gaskets (6) in place.
l.
Position flexible connection
(5) in place.
m. Secure with flatwashers (4),
capscrews (3), lockwashers
(2), and nuts (1).
n. Reconnect piping to mufflers.
WARNING
Treat all pipping and exhaust lines as being insulated with asbestos material. Protective
clothing and respirators shall be worn at all times when handling asbestos-covered piping
and exhaust lines.
o. Install asbestos covering.
If used.
5-478


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business