Tweet |
Custom Search
|
|
|
||
TM 55-1905-221-14-2
5-30.
TRANSMISSION CONTROL VALVE (Continued).
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION
10.
Control
a.
Position new mounting gasket
Valve
(20) in place over opening
Assembly
in top of reduction gear
housing cover.
b.
Place control valve assembly
(19) over gasket with mount-
ing capscrew holes in align-
ment, and end lever attaching
end of selector valve facing
control side of unit.
c.
Secure with flatwashers (18),
Torque capscrews
lockwashers (17), and cap-
to 35-39 lb.ft.
screws (16).
(47.5-52.9 Nm).
d.
Position oil cooler to control
Use new gaskets.
valve oil tube gaskets (5) in
place on back of control valve
housing (19).
e.
Secure oil supply hoses (4
and 3) to housing with lock-
washers (2) and bolts (1).
f.
Position reverse gear inlet
Use new gaskets.
tube gaskets (15 and 14) in
place.
g.
Install inlet tube assembly
Torque capscrews
(13) using lockwashers (7),
to 7-9 lb. ft.
non-metallic washers (9),
(9.5-12.2 Nm),
capscrews (8), and bolts (6).
and bolts to
13-17 lb. ft.
(17.6-23.0 Nm).
h.
Position reverse gear inlet
Use new gaskets.
tube gaskets (11 and 12) in
place.
5-562
|
||