Custom Search
 
  
 
TM 55-1905-222-14
Operator Preventive Maintenance Checks and Services - (Continued)
Equipment is Not
PROCEDURES
INTERVAL
ITEM
Item To Be
Ready/Available If:
Check for and have repaired
NO.
Inspected
or adjusted as necessary
B
D
A
W
M
f. Hydraulic
Check hydraulic fluid level
Reservoir is low or empty
Reservoir
through sight glass. Add od as
needed Inspect tank con-
nections for leaks and tighten
as necessary
g. Filters and
Inspect stramers and filters for
Strainers
cleanliness and serviceability.
Check for leaks at filters.
Replace strainers and filters as
necessary (para. 3-11)
Bilge System
36
Piping, Valves,
Inspect all bilge piping joints,
Hoses and Fit-
valves and hose assemblies for
tings.
leaks. Inspect valves to ensure
they open and close completely
with no binding. In each void,
check bellmouth strainer for
debris and clean as necessary.
Repair piping joints by brazing,
replace hose assembles as in-
dicated m para. 4-30.
37
Bilge Pump and
Inspect bilge pump and
Pumps fail to function.
Hydraulic Motor
hydraulic motor for secure
mounting. Tighten mounting
hardware as necessary Ensure
pump is primed during opera-
tion. Replace or repair as
Note
Do not tamper with bypass flow
regulator setting of 10 gpm and
1500 psi relief.
Change 6 2-31


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business