Custom Search
 
  
 
TM 55-1905-222-14
5-8 REPLACE THROTTLE LINKAGE (Continued).
LUBRICATION
LUBRICATE RED KNOB CONTROL UNIT
Apply two or three shots of grease from a grease
gun to the grease fitting on the lever of the red
knob control unit (15).
INSTALLATION
1.
ASSEMBLE AND INSTALL GOVERNOR CONTROL
ROD ASSEMBLY
a.
Install coupling tube (23) on rod ends (22). Adjust
to length "A" recorded above.
b.
Install rod ends (22) and secure with lockwashers
(21) and hex nuts (20).
2.
CONNECT THROTTLE CABLE TO CONTROL
HEAD IN PILOTHOUSE.
a.
Drop engine end of throttle cable into engine room
through access in pilothouse.
b.
Install cable connector (3) and jam nut (8) to
throttle cable (6).
c.
Install cable clamp (5) and secure with screws (4).
d.
Install cable connector (3) onto throttle extension
kit (7) and secure with bolt (2) and nut (1).
3.
CONNECT
THROTTLE
CABLE
AND
ARTICULATOR TO RED KNOB CONTROL UNIT IN
ENGINE ROOM.
a.
Ensure  that throttle cable is routed to engine
room as required..
b.
Install throttle cable (19) onto cable adapter
bushing (18) and secure with locknut (17).
5-20


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business