Tweet |
Custom Search
|
|
|
||
TM 55-1905-222-14
5-37 REPLACE RUDDER (Continued).
j. Remove lower thrust flange (28),
upper thrust flange (29), and
thrust bearing (30)
k. Remove sleeve bearing (40) from
stuffing box. Discard if damaged
I. Remove upper rudder stock (18)
INSTALLATION
1.
INSTALL RUDDER AND TILLER
a. Install upper rudder stock (18).
b. Install sleeve bearing (40) In stuffing box (34)
Replace if damaged.
c. Install flax packing (39) In stuffing box (34) Use
new packing.
d. Place packing gland (38) over end of rudder stock
e. Install studs (37), nuts (36), and jam nuts (35) to
secure. Do not tighten.
f. Position stuffing box (34) and gasket (33) in place.
g. Secure with capscrews (32) and nuts (31) Do not
tighten.
h. Position thrust bearing (30) in place, then place
upper thrust flange (20) and lower thrust flange
(28) over bearing.
i. Place assembled tiller in place in vessel and
secure flange assembly with capscrews (27),
lockwashers (26), and flange mounting nuts (25).
J. Secure rudder stock assembly to vessel with nut
(24).
5-94
|
||