Custom Search
 
  
 
TM 55-1905-222-14
MAINTENANCE OF RAMP HOIST HAND PUMP
6-8
REPAIR RAMP HOIST HAND PUMP.
This task covers
a. Disassembly
c. Inspection
b. Cleaning
d. Assembly
INITIAL SETUP
Tools:
Equipment Conditions:
Tool Kit, Mechanic's, Rail
Reference
and Marine
Para 5-20 Hand pump removed
Materials/Parts'
Valve Spring
P/N 1000-23-0
Preformed Packing
P/N 1000-25-8
Seal Washers
P/N 1000-6-0
Crocus Cloth
Item 20, Appendix E
Cleaning Solvent
Item 17, Appendix E
DISASSEMBLY
DISASSEMBLE RAMP HOIST HAND PUMP
a. Remove rubber hand grip (1).
b
Remove handle (2) from lever (5).
c
Remove cotter pins (3), pins (4), and remove
lever (5).
d. Remove cotter pin (3), pin (4), and pump link
(6).
e. Remove release screw (7), seal washer (8),
release ball cage (9), and release ball (10).
Discard seal washer.
6-31


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business