Tweet |
Custom Search
|
|
|
||
TM 55-1905-222-14
6-18 REPAIR ACCUMULATOR (Continued).
o. Install retainer plate (10) Then, secure
assembly with lockwashers (9), and screws
(8).
p. Release pressure and remove assembly
fittings.
q. Install fuse assembly gasket (6), and
fusible plug (5) Torque to 20-25 lbs ft (27
1 - 33 9 N ).
m
r. Install air valve gasket (4) and air valve
(3). Torque to 45-50 lb ft (61.0 - 67.8 N )
m
DO NOT tighten air valve (2)
CHARGING
CHARGING ACCUMULATOR
a. Attach gauge (21) end of the charging
kit to nitrogen tank.
b. Install air valve stem extension (22)
on the air check valve (23).
c. Completely back off shaft pin in the
air check valve connector (24) on the
charging kit hose (25).
(1)
Install connectors on the air
valve stem extension (22)
(2)
Draw swivel nut (26) up tight.
d. Loosen air valve (2) on
the
accumulator air valve stem.
(1) Turn counterclockwise.
(2) Turn locknut 1-1/2 turns only.
e. Turn the shaft pin In the air check
valve connector (27) clockwise until
the valve core air valve is depressed.
6-99
|
||