Custom Search
 
  
 
TM 55-1905-223-10
Table 2-2. Operator/Crew Preventive Maintenance Checks and Service - CONT
B - Before
D - During
A - After
W - Weekly
M - Monthly
INTERVAL
PROCEDURES
EQUIPMENT IS
ITEM
ITEM TO BE
CHECK FOR AND HAVE REPAIRED
NOT READY/
NO
B
DA W M
INSPECTED
OR ADJUSTED AS NECESSARY
AVAILABLE IF:
40
Stern
Anchor
Winch -
continued
WARNING
Refer dripping oil and hydraulic fluid leaks
to your supervisor and unit maintenance.
Wire Rope
Check cable for damage or
l
ll
corrosion.
41
l Shore Terminal
l
Box
WARNING
Defer PMCS when shore power
operation is in progress. High
voltages could cause serious
injury or death.
VISUALLY INSPECT BOX EXTERIOR FOR DAMAGE AND
CORROSION. ENSURE BOX IS SECURELY FASTENED TO
BULKHEAD. REMOVE SCREWS SECURING BOX COVER AND
OPEN FOR INSPECTION OF INTERIOR.
Visually check cable connectors
(internal) for damage and
corrosion.
42
Roller Fairlead
Inspect roller to ensure it
l
l
l
(Port)
rotates freely. Check to
ensure that base is securely
mounted. For lubrication refer
to LO 55-1905-223-12.
43
Towing Hauser
Inspect reels for obvious
l
l
l
Reels (2)
damage. Ensure reels rotate
freely.
Change 4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business