Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-10
Table 2-2. Operator/Crew Preventive Maintenance Checks and Service - CONT
B - Before
D - During
A - After
W - Weekly
M - Monthly
INTERVAL
PROCEDURES
EQUIPMENT IS
ITEM
ITEM TO BE
CHECK FOR AND HAVE REPAIRED
NOT READY/
NO
B
DA W M
INSPECTED
OR ADJUST AS NECESSARY
AVAILABLE IF:
86
Main Propulsion
Engine (Port) -
continued
Start Control
Start engine and note action of
starter mechanism, particularly
whether mechanism has adequate
cranking speed and whether it
engages and disengages without
unusual noise when the control
is operated. Set throttle so
that the engine will run at
normal warmup speed until pre-
scribed operating temperature
is reached. If the oil pres-
sure gauges do not indicate the
proper pressure as specified
within 30 seconds, stop the
engine.
87
Ship's Service
Diesel Generator
WARNING
(Port)
Before attempting any
maintenance task on the
generator set, make sure the
generator is off-line. Make
sure the engine is shut off and
that the starting circuits are
disabled to avoid injury to
personnel. Make sure that you
read the Warning Section at the
front of this manual.
Engine
Inspect engine, generator, fuel
Accessories and
injection pumps and cooling
Connections
pumps for loose or damaged
connections or mountings.
Water Pump Belt
Visually inspect the engine.
Look for glazed, loose, frayed,
cracked or misaligned belt,
refer defects to unit
maintenance.
2-258
|
||