Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-10
Table 2-2. Operator/Crew Preventive Maintenance Checks and Service - CONT
B - Before
D - During
A - After
W - Weekly
M - Monthly
INTERVAL
PROCEDURES
EQUIPMENT IS
ITEM
ITEM TO BE
CHECK FOR AND HAVE REPAIRED
NOT READY/
NO
B
DA W M
INSPECTED
OR ADJUST AS NECESSARY
AVAILABLE IF:
87
Ship's Service
Diesel Generator
(Port) -
continued
Hoses
CAUTION
Do not bend or deform the hoses
during inspection. This can
cause the hoses to crack.
a.
Visually inspect all hoses
for cracks or cuts and check
for any signs of bulging or
collapsing.
b.
Check for loose fittings and
Class III
clamps, and signs of
leaks.
leakage. Tighten or replace
as necessary.
c.
For replacement, refer to
unit maintenance.
Oil Level
NOTE
Allow time for the oil to
settle in the pan after engine
shutdown. Check the engine oil
level. The oil level should be
at, or near, the "H" (high)
mark on the dipstick. Add oil
as necessary. Refer to LO 55-
1905-223-12 for oil
specifications.
Coolant Level
Check the coolant level at the
expansion tank. It should be
3/4 of the way up sight glass
in cold condition. Add coolant
at the expansion tank as
necessary. Refer to TB 55-
1900-207-24 for antifreeze and
other additive requirements on
make-up coolant.
2-259
|
||