Custom Search
 
  
 
TM 55-1905-223-10
Table 2-2. Operator/Crew Preventive Maintenance Checks and Service CONT
B Before
D During
A After
W Weekly
M- Monthly
INTERVAL
PROCEDURES
EQUIPMENT IS
ITEM
ITEM TO BE
CHECK FOR AND HAVE REPAIRED
NOT READY/
NO.
B
D
A
W
M
INSPECTED
OR ADJUSTED AS NECESSARY
AVAILABLE IF:
129
Bowthruster
Waterjet
continued
NOTE
The hydraulic system can be
operated safely at fluid levels any-
where between the HIGH and LOW
mark on the sight gauge/thermo-
meter. Low fluid level can cause
high operating temperature. When
the level reaches the LOW mark or
when fluid temperature exceeds
150F, add fluid until level reaches
HIGH mark.
Visually inspect pump for leaks, loose
Emergency
130
connections and damage.
Fire Pump
Check for any unusual noise or
vibration.
Required
Monitor pressure gauge. Pressure
pressure cannot
should be 105 psi, maintain by speed
be maintained or
of bowthruster engine.
pressure too
high.
Ref. TM 55-1905-243-24&P, FM-200,
FM-200
131
Fire Fighting System for LCU-2000.
System
Ref. TM 55-1905-243-24&P, FM-200,
Water Wash-
132
Fire Fighting System for LCU-2000.
down System
(WWS)
Change 10


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business