TM 55-1905-223-10
(2) Foam station shutdown. At foam station selected perform following:
(a) Close nozzle valve.
(b) Close FM-23, STBD FOAM MONITOR ISLN (12).
(c)
Close FM-24, PORT FOAM MONITOR ISLN (11).
(d) Open nozzle valve.
(e) Observe flow until sea water is output.
(f)
Close nozzle valve.
(g) Close FOAM station isolation valve.
(h) Open FM-23, STBD FOAM MONITOR ISLN (12).
(i)
Open FM-24, PORT FOAM MONITOR ISLN (11).
(j)
Open nozzle valve to relieve pressure in fire hose.
(k)
Disconnect hose from foam station isolation valve.
(l)
Open nozzle valve.
(m) At nozzle end, raise hose and "walk back," continuing to raise hose, to FOAM station isolation valve
connection. This will drain hose.
(n) Connect hose to foam station isolation valve.
(o) Close nozzle valve.
(p) Stow hose on the hose storage rack.
e.
Fire Monitor
(1)
Fire Monitor Operation.
(a) Direct monitor at fire.
(b) Open isolation valve for desired monitor.
(2)
Fire Monitor Shutdown (after use with sea water).
(a) Close isolation valve for desired monitor.
(b) Secure monitor.
(3)
Fire Monitor Shutdown (after use with foam).
(a) Close FM-24, PORT FOAM MONITOR ISLN (11).
(b) Close FM-23, STBD FOAM MONITOR ISLN (12).
2-323