Observe flow until sea water is output.
(d) Close isolation valve for desired monitor.
(e) Secure monitor.
a.
Align Compressed Air Piping System (FIGURE 2-104).
(1)
Close all valves in Compressed Air Piping System.
(2)
Open LPA-1, DISCH-AIR CPRSR NO. 1 (16).
(3)
Open LPA-2, DISCH-AIR CPRSR NO. 2 (23).
(4)
Open LPA-3-, ISLN-AIR RCVR NO. 1 (41).
(5)
Open LPA-4, ISLN-AIR RCVR NO. 2 (46).
(6)
Open LPA-28, PRESS GAGE AIR RCVR NO. 1 (39).
(7)
Open LPA-27, PRESS GAGE AIR RCVR NO. 2 (48).
(8)
Open LPA-5, SUPPLY TO PRESS RDCR (33).
(9)
Open LPA-6, SUPPLY TO MANF (35).
(10) Open LPA-31, PRESS GAGE (36).
(11) Open LPA-29, TO AIR CPRSR UNLOADERS (31).
(12) Open LPA-30, PRESS SW (32).
b.
On Auxiliary Machinery Motor Control Center (FIGURE 2-105), set AIR COMPRESSOR NO. 1 (P205-
10) (3) and AIR COMPRESSOR NO. 2 (P205-11) (1) circuit breakers to ON position.
c.
At air compressor TYPE-I Motor Switches (FIGURE 2-106).
(1)
Release STOP button (2) by sliding LOCK (3) down.
(2)
Press START button (1).
NOTE
Compressors may also be started at Auxiliary Machinery Control Center with
START pushbutton (2, FIGURE 2-105) and (4).
d.
When pressure in the system reaches 125 psi, activate control air as follows:
(1)
Open LPA-8, SUPPLY TO CONTROL AIR (25, FIGURE 2-104).
|
||