TM 55-1905-223-10
(b) Remove LIFTING SLING (14) and guidelines.
(c) Secure GANGPLANK (1) by placing lines through each end slot and securing each line to
LCU railing.
(d) Place railings (one on each side of gangplank) in designated TUBE SLOTS (15).
2-35. Equipment Condition Prior To Getting Underway. Refer to standard operating procedures for presail
checklist and perform all required procedures.
2-36. Main Engine Shutdown.
a. Allow main engines to idle for no longer than 3 minutes.
b. In Engine Operating Station on the Engine Room Console (FIGURE 2-225), press STOP pushbuttons
(1 and 2).
c. Close all valves.
2-37. Gyro Compass MARK 27 MOD 1 Shutdown.
a. On Gyro Compass Mk 27 Mod 1 (FIGURE 2-226), set SELECTOR switch (1) to OFF position.
b. At Power Panel EP103, set Mk 27 GYRO PWR CONV UNIT switch to OFF position.
c. At Power Panel EP103, set MK 37 HEADING XMTR switch to OFF position.
2-38. Fresh Water Piping System Shutdown.
a. Shutdown Fresh Water Piping System.
(1) In Engine Room on Fresh Water Motor Controller (P217) (FIGURE 2-227),press STOP
pushbutton (2); set circuit breaker handle (1) to OFF position.
(2) In Engine Room on Fresh Water Motor Controller (P218), press STOP pushbutton (2); set
circuit breaker handle (1) to OFF position.
(3) Close FW-8, ISLN/SUCT-TK FW-6P (4, FIGURE 2-228).
(4) Close FW-7, ISLN/SUCT-TK FW-6S (8).
(5) Close FW-10, FW PUMP NO. 2 SUCT FM FW TKS (26).
(6) Close FW-9, FW PUMP NO. 1 SUCT FR FW TKS (24).
(7) On Main Switchboard (FIGURE 2-223), set HOT WATER HEATER circuit breaker (7) to the
OFF position.
(8) Open FW-80, PRESSURE TANK DRAIN (22, FIGURE 2-228).
NOTE
In Fresh Water Piping System all other valves are for equipment repair or fresh
water use.


 