Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-10
a. Pay out power cable from overhead rack up ladder to the 02 stern deck.
b. Position cable end through bottom section of hand rail.
c. Tie one end of heaving line to cable end.
d. Throw heaving line to dockside facilities.
NOTE
There are 75 feet of cable; direct attention to the amount of cable remaining on the
deck. There should be a sufficient amount of cable on the deck to prevent it from
paying out completely. Attach a preventer line to prevent complete cable runoff.
e. Coordinate cable payout between onboard and dockside crew.
f. Connecting cables (FIGURE 2-269).
WARNING
Ensure that no electrical power is applied to dock connections prior to connecting
shore power cables.
Ensure shore ends of cable are connected to the proper phased connection. Shore
power facilities may vary in arrangement and method of hook-up.
(1) Loosen two TERMINAL COVER bolts (4) holding TERMINAL COVER (1).
(2) Open TERMINAL COVER (1).
(3) Remove PIPE PLUG (11).
(4) Install cable (12) into terminal box.
NOTE
Consult phase tags to ensure proper wire to terminal connection.
(5) Connect wire (3) to top "Ground" TERMINAL (2).
(6) Connect wire (5) to top "A" PHASE TERMINAL (6).
(7) Connect wire (9) to middle "B" PHASE TERMINAL (10).
(8) Connect wire (7) to bottom "C" PHASE TERMINAL (8).
NOTE
After installing cables into shore power terminal box follow shifting to shore power
procedures in paragraph 2-34b.
2-718
|
||