Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-1
e.
Install pipe to tube elbow (9), nonmetallic hose (10), and pipe to tube elbow (5). Connect electrical
connections.
f.
Refill engine with lube oil (PMCS Table 2-1, Item 6), start engine (TM 55-1905-223-10), and check
for leaks. Repair as required.
FIGURE 2-61. Oil Pan and Adapter Group Capscrew Torque Sequence.
2-142
|
||