Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-1
d.
Remove protective caps, plugs, inserts, wrappings, and tape when inspection/inventory is
completed. Inspect piping openings for damage. Wipe off dirt, grease or protective films at time of
installation.
e.
Remove chocks from resilient mounted components.
3-5.
Initial Setup Procedure. Includes operational checks and inspections that are not performed for a
routine startup. Direct support maintenance personnel will perform initial setup in accordance with the
operator's manual, TM 55-1905-223-10.
3-6.
Normal Startup. Refer to the operator's manual, TM 55-1905-223-10.
3-7.
Shutdown Procedure (Usual or Unusual). Refer to the operator's manual, TM 55-1905-223-10.
SECTION III. INTERMEDIATE DIRECT SUPPORT PREVENTIVE
MAINTENANCE CHECKS AND SERVICES (PMCS)
3-8.
PMCS. There is no PMCS at the direct support level. See Chapter 2, Section III.
3-2
|
||