Custom Search
 
  
 
TM 55-1905-223-24-10
CHAPTER 1
INTRODUCTION
Page
Section
I
General Information ................................ ............................... ..................
Section
II
Equipment Description and Data ................................ ...............................
Section
III
Principles of Operation ................................ ............................... ..............
Section I. GENERAL INFORMATION
1-1. Scope. The scope of this manual is as follows:
a.
Type of Manual. Unit, intermediate direct support, and intermediate general support maintenance manual.
b.  Name of Equipment. The equipment covered by the manual is the bow ramp winch assembly that is installed
aboard the LCU 2000 Class Watercraft. The system is made up of the following components (FIGURE 1-1).
(1) Hydraulic Winch Assembly
(2) Hydraulic Power Pack Assembly
c.
Purpose of Equipment. The bow ramp winch assembly is used to lower and raise the bow ramp.
1-2. Maintenance Forms, Records, and Reports . Department of the Army forms and procedures used for equipment
maintenance are prescribed by DA Pam 738-750, The Army Maintenance Management System.
1-3.  Destruction of Army Materiel to Prevent Enemy Use
. Refer to TM 750-244-3 for instructions covering the
destruction of Army materiel to prevent enemy use.
1-4. Reporting Equipment Improvement Recommendations  . If your equipment needs improvement, let us know.
Send us an EIR. You, the user, are the only one who can tell us what you don't like about your equipment. Let us know
why you don't like the design. Put in on an SF 368 (Quality Deficiency Report). Mail it to Commander, U.S. Army Troop
Support Command, ATTN: AMSTR-QX, 4300 Goodfellow Blvd., St. Louis, Missouri 63120-1798. We'll send you a reply.
1-5. Preparation for Storage or Shipment .  Administrative storage of equipment issued to and used by Army
activities will have preventive maintenance performed in accordance with the Preventive Maintenance Checks and
Services (PMCS) charts before storing. When removing the equipment from administrative storage, the PMCS should
be performed to assure operational readiness. Disassembly, and repacking of equipment for shipment or short term
storage, are covered in paragraph 2-36.
1-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business