b. Bow Ramp Winch Assembly from Storage.
(1) Move bow ramp winch assembly to a staging area prior to installation on vessel.
(2) Accomplish tasks in paragraph a.(2) and a.(3). Thoroughly clean and flush the winch with fresh water or
steam clean and dry with compressed air. Bow ramp winch is ready to install.
c. Inspection of Bow Ramp Winch Assembly. Prior to restoring system to normal operation make the following
checks.
(1) Visually inspect all hydraulic system valves, piping and fitting for leakage, wear or damage, tighten, repair
or replace as required.
(2) Visually inspect all electrical conduit fittings and terminal connections for tightness.
(3) Visually inspect solenoids and switches for buildup of dirt, dust, etc., clean as required and apply a light
coat of silicone spray lubricant. Check operation and verify proper control system indications.
(4) Check emergency break release pump and hand crank operation, lower and raise the bow ramp.
(5) Visually inspect cable anchors for buildup of dirt, dust or corrosion, clean, inspect for signs of slippage and
replace as required, see Chapter 4.
(6) Visually inspect all mounting bolts and secure as required.
(7) If required, paint the bow ramp winch assembly as required per TM-43-0139, Painting Instructions for Field
Use.
2-76


 