Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-11
CHAPTER 2
UNIT MAINTENANCE INSTRUCTIONS
Page
Section I
Repair Parts, Special Tools List; Test, Measurement, and Diagnostic
Equipment (TMDE); and Support Equipment. ...................................................... 2-1
Section II
Service Upon Receipt .......................................................................................... 2-1
Section III
Unit Preventive Maintenance Checks and Services (PMCS)................................ 2-8
Section IV
Unit Maintenance Troubleshooting....................................................................... 2-13
Section V
Unit Maintenance Procedures .............................................................................. 2-19
Section VI
Preparation for Storage or Shipment.................................................................... 2-102
SECTION I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT, AND
DIAGNOSTIC EQUIPNENT (TMDE); AND SUPPORT EQUIPMENT
2-1.
Common Tools and Equipment. For authorized common tools and equipment, refer to the Modified
Table of Organization and Equipment (MTOE) applicable to your unit.
2-2.
Special Tools, TMDE, and Support Equipment. For special tools, TMDE, and support equipment,
refer to the Maintenance Allocation Chart (Appendix B), and to TM 55-1905-223-24P.
2-3.
Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (TM 55-
1905-223-24P) covering unit maintenance of this equipment.
SECTION II. SERVICE UPON RECEIPT
2-4. Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,
report the damage in accordance with the instructions of DA Pam 738-750.
b. Check the equipment against the packing slip to see if the shipment is complete.
Report all
discrepancies in accordance with the instructions of DA Pam 738-750.
c.
Check to see whether the equipment has been modified.
d. Remove and replace protective caps, plugs, inserts, wrappings, and tape when inspection/inventory
is completed. Inspect piping openings for damage. Wipe off dirt, grease, or protective films at time
of installation.
2-1
|
||