Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-11
(2) Screw the connections into their proper locations. Tighten the connections until snug.
CAUTION
Do not overtighten. PVC fittings may crack.
(3) Make sure the connections are aligned with their respective hoseconnections. I
d. Install the inlet hose (5, FIGURE 2-21) and clamps (4). Tighten to 40 in-lb.
e. Install the outlet hose (2, FIGURE 2-21) with clamps (1). Tighten to 40 in-lb.
f.
Connect the electrical cable to the pump system (paragraph 2-18).
g. Open the following valves:
(1) Sewage inlet and outlet
(2) Bleach metering
(3) Backwash water supply
h. Restore electrical power, start the unit and conduct run check (paragraph 2-6) (TM 55-1905-223-10).
2-82
|
||