Custom Search
 
  
 
TM 55-1905-223-24-13
CHAPTER 2
UNIT MAINTENANCE INSTRUCTIONS
Page
Section
I
Repair Parts, Special Tools; Test, Measurement, and
Diagnostic Equipment (TMDE); and Support Equipment .............................................................. 2-1
Section
II
Service Upon Receipt ................................................................................................................. 2-1
Unit Preventive Maintenance Checks and Services (PMCS) . ...................................................... 2-2
Unit Troubleshooting .................................................................................................................... 2-4
Unit Maintenance Procedures ...................................................................................................... 2-5
Preparation for Storage or Shipment ............................................................................................ 2-21
SECTION I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT,
AND DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT
2-1. Common Tools and Equipment. For authorized common tools and equipment, refer to the Modified Table of
Organization and Equipment (MTOE) applicable to your organization.
2-2.  Special Tools, TMDE, and Support Equipment. Special tools; test, measurement, and diagnostic equipment;
and support equipment requirements are listed and illustrated in the Repair Parts and Special Tools List (RPSTL), TM
55-1905-223-24P. These items are also listed in the Maintenance Allocation Chart (MAC), Appendix B of this manual.
2-3. Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL), TM 55-
1905-223-24P.
SECTION II. SERVICE UPON RECEIPT
2-4. Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred during shipment. If the shipment has been damaged, report the
damage in accordance with the instructions of DA Pam 738-750.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of DA Pam 738-750.
c.
Check to see whether the equipment has been modified.
d. Remove and replace protective caps, plugs, inserts, wrappings, and tape when inspection/inventory is
completed. Inspect piping openings for damage. Wipe off dirt, grease, or protective films at time of
installation.
2-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business