Custom Search
 
  
 
TM 55-1905-223-24-15
(5) Reconnect electrical power connections to the ac motor, and remove tags.
b. Install Liquid Sight Indicator.
CAUTION
Be careful not to crack sight gauge when reassembling to avoid leaks.
(1) Position liquid sight indicator (7) to the mounting holes on the reservoir.
(2) Secure indicator with attaching connectors. (See detail, FIGURE 2-6).
c. Install Breather.
(1) Connect safety chain (24) securing the breather. (See detail, FIGURE 2-6).
(2) Replace breather (5).
d. Install Reservoir Heater.
(1) Replace reservoir heater (15) in reservoir body and secure with attaching hardware.
(2) Remove tags and attach electrical power connections to heater.
(3) Install thermostat cover.
e. Install Suction Strainer. Connect suction strainer (12) to coupler (11).
f. Install Relief Valve.
(1) Replace relief valve (13).
(2) Secure relief valve to the control valve (4).
(3) Connect relief valve hydraulic line (14).
g. Install Fluid Filter Head and Dial Pressure Gauge.
CAUTION
Securing the filter element too hard could result in warping the filter gasket, causing fluid leaks.
Do not secure filter more than procedure calls for.
(1) Screw pipe (17) into retaining nut (16).
(2) Screw elbow (19) onto pipe (17).
(3) Attach dial pressure gauge (1).
2-24


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business