Custom Search
 
  
 
TM 55-1905-223-24-15
(8) Install clutch handle (6) and secure with screw (7), lock washer (9), and nut (8).
d. Install Bearing.
(1) Press bushing (18, FIGURE 4-5) into housing.
(2) Install bearing unit housing (17) and lubrication fitting (19).
(3) Secure bearing unit housing (17) with screw (14), lock washer (16), and nut (15).
e. Attach lifting sling to anchor windlass and place windlass on foundation. Replace six nuts and bolts. Tighten
bolts to 350 ft-lb (475 N.M) torque.
f. Install Manual Control Brake.
(1) Replace brass screw (16, FIGURE 4-6) and self-locking nut (17) to secure lining (15) to brake band (14).
(2) Install brake band lining (15) and brake band (14).
(3) Replace anchor brake pin (8).
(4) Install top brake pin (10) and bottom brake pin (9).
(5) Install anchor brake arms (11).
(6) Install cotter pins (5), washers (6), and lubrication fittings (7).
(7) Install shaft collar (13) on brake rod (4).
(8) Install brake rod (4) by screwing into anchor brake pin (8). Position shaft collar (13) on brake rod (4) and
screw with setscrew.
(9) Install machine key (13).
(10) Install manual control handle (wheel) (2).
(11) Secure wheel (2) with self-locking nut (1).
g. Install Catheads.
(1) Install machine keys (5, FIGURE 4-5) on each end of shaft.
CAUTION
To prevent injury to personnel or damage to equipment, use lifting sling to support catheads.
4-22


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business