TM 55-1905-223-24-16
(4)
Install lead pellet (20) into body of detachable chain link (12) with a hammer.
(5)
On stern control box, momentarily move control switch to HAULBACK mode to take up slack in wire rope.
h.Perform Operational Test.
Refer to the operator's manual, TM 55-1905-223-10.
4-15