Custom Search
 
  
 
Preventive Maintenance Checks and Services
Table 2-1.
Q - Quarterly
S - Semiannually
A - Annually
D - Daily W - Weekly M - Monthly
Items To Be
Interval
Item
Procedures
Inspected/
No.
D
W
M
Q
S
A
Serviced
DOORS, HATCHES, AND MANHOLES/WINDOWS GROUP - CONT
q
Watertight
65
NOTE
Doors CONT
After inspection and cleaning
procedures indicated above
have been completed, the
following restoration
measures should be
accomplished to the degree
inspection indicates
necessary.
(3) Remove old gasket and clean gasket coaming with
wire brush (Item 29, Appendix C) until bare metal
is exposed.
(4) Apply one coat of formula 150 primer and two
topcoat5 of formula 151 or equivalent paint (Items
30 and 31, Appendix C). Take care not to paint
knife-edges.
(5) Install new gasket (if removed in step (3).
(a) Measure and cut new gasket.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business