Custom Search
 
  
 
TM 55-1905-223-24-18-1
MAINTENANCE OF MACHINERY SHOP EQUIPMENT
Replace/Repair Arc Welding Machine. (FIGURE 2-43)
2-51.
a. Removal, b. Repair, c. Replacement.
This task covers:
INITIAL SETUP
Equipment Condition
Tools
Electrical power to unit OFF at the
Tool kit, general mechanic's,
ship's service switchboard.  Switch
tagged "Out of Service - Do Not
T o o l kit, electrician's,
Operate."
Lifting sling P/N 3375958
Materials/Parts
Arc welding machine
P/N 1341-0354
Warning tags, Item 1, Appendix C
Close water and gas valves.
a.
Disconnect water, and gas connections (3).
b.
Remove power cable from bulkhead terminal box.
c.
Disconnect welding leads (1).
d.
Remove deck mounting nuts (2) from the arc welding machine frame.
e.
The arc welding machine weighs in excess of
50 lb.  I t will require a lifting sling and
dolly to move.
Remove arc welding machine.
f.
Repair at this level of maintenance is by replacement of arc welding machine.
2-289
Change 1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business