Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-1
d.
I n t e r l o c k / S h u n t coil/Electrical contact assembly.
(1) Refer to paragraph 2-223, removal of auxiliary contact.
(2) Remove interlock (26).
(3) Remove shunt coil (25).
(4) Remove electrical contact assembly (27).
Overload coils.
e.
(1) Refer to paragraph 2-222, removal of thermal release relay.
(2) Overload coils (23).
f.
Transfer.
( 1 ) Tag and disconnect electrical leads from transformer (1). (Internal
wiring).
(2) Remove four plain hex nuts (2), lockwashers (3) and machine screws (4)
(3) Remove transformer.
Fuseholder block.
g.
(1) Tag and disconnect electrical leads from fuse blocks (28) and 33).
(2) Remove fuse cartridges (29) and (34).
(3) Remove two plain hex nuts (30), lockwashers (31) and machine screws (32)
from each fuse block.
(4) Remove Fuse blocks.
h.
Terminal board.
(1) Tag and disconnect electrical leads from terminal board (9).
(Internal
wiring).
(2) Remove two plain hex nuts (12), lockwashers (13) and machine screws (14)
from section end (10).
(3) Remove terminal board and end section.
(4) Remove terminal board marker strip (11).
i.
Rotary switch.
(1) Tag and disconnect electrical leads from rotary switch (5). (Internal
wiring).
|
||