Tweet |
Custom Search
|
|
|
|||||
|
|||||
TM 55-1905-223-24-18-1
Tighten bolts in sequence as shown in FIGURE 2-248.
(1)
FIGURE 2-261. Torque Sequence Diagram (Typical).
(2) Tighten bolts until a noticeable increase in torque is felt and when metal
to metal contact is made.
c. Operational check.
(1) Remove warning tags and turn on electrical power at 240 V main
switchboard.
(2) Operate system; refer to TM 55-1905-223-10.
(3) Check for leaks in system and retighten connections as necessary.
2-988
|
|||||