Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
(30) Install male adapter elbow (1) on actuator.
(31) Connect hose (3) at male adapter elbow with hose connector (2).
(32) Remove tag from pull box.
b. Main Machinery Room.
(1) Disconnect hose connector (2, Figure 3-3) at male adapter tee (3) to remove hoses (1).
(2) Remove male adapter tee from actuator (4).
(3) Repeat steps (1) and (2) for other halon tank in subsystem.
NOTE
Halon tank servicing procedures are for the same paint locker and the main
machinery room.
(4) Refer to steps a.(3) through a.(29) above.
(5) Install male adapter tee (3) on actuator.
(6) Connect hoses (1) at male adapter tee with hose connectors (2).
(7) Repeat steps (5) and (6) for other halon tank in subsystem.
(8) Remove tag from pull box.
3-50
|
||