TM 55-1905-223-24-18-2
This task covers:
a. Removal,
b. Replacement.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
Drain (second stage) vessel as
specified in para. 2-30 .
Control module assembly removed
as specified in para. 2-26 .
Materials/Parts
Vessel subassembly P/N 1332
REMOVAL
NOTE
Disconnect piping system from vessel. Plug/cap all pipe fittings and openings.
a. Ensure that vessel is firmly secured for removal.
b. Remove four hex plain nuts (3), lockwashers (2), and machine bolts (1) securing vessel to mounting
skid.
c. Remove vessel.
REPLACEMENT
a. Carefully position second stage vessel on mounting skid with bolt aligned.
b. Install four machine bolts (1), lockwashers (2), and hex plain nuts (3) and secure vessel to mounting
skid. There are no torque requirements.
NOTE
Unplug/cap all pipe fittings and openings. Connect piping system to vessel.
c. Control module assembly replaced as specified in paragraph 2-26 .
d. Restore to normal operation as specified in paragraph 2-30 .