Tweet |
Custom Search
|
|
|
|||||
|
|||||
TM 55-1905-223-24-18-2
s. Install machine screw (59).
t. Install power transformer (61).
u. Install lockwashers (56, 64) and hexagon nuts (55, 63).
v. Install flat washers (54, 67), lockwashers (53, 66), and hexagon head capscrews (52, 65).
w. Install bracket (50).
x. Install lockwasher (85) and machine screw (84).
y. Install electrolytic fixed capacitor (50).
z. Install cartridge fuse (49).
aa. Install fusible disconnect switch (48).
ab. Install flat washer (47) and machine screw (46).
ac. Install shaft (42).
ad. Install ground lug terminal (43).
ae. Install lockwasher (45) and machine screw (44).
af. Install fixed capacitor (41).
ag. Install cartridge clamp (40), lockwasher (39), and machine screw (38).
ah. Install electromagnetic relay (32).
ai. Install lockwasher (37) and machine screw (36).
aj. Install identification plate (89) and terminal board (90). Remove tags and connect electrical leads.
ak. Install lockwasher (33) and machine screw (32).
al.
Install resistor assembly (22, Sheet 1) and electromagnetic relay (27). Remove tags and connect
electrical leads.
am. Install machine screw (30), lockwasher (29) and plain hexagon nut (28).
an. Install circulating fan (23).
ao. Install machine screw (24), lockwasher (25), and plain hexagon nut (26).
ap. Install electrical component tie-down strap (19).
aq. Install plain hexagon nut (15), lockwasher (16), flat washer (17), and machine screw (18).
3-231
|
|||||