Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
This task covers:
a. Removal
b.
Repair
c.
Replacement
INITIAL SETUP
Tools
Equipment Condition
Tool kit, electrician's,
Electrical power to machinery plant
monitoring and alarm system secured
and tagged "Out of Service - Do Not
Operate."
Materials/Parts
Warning Tags, Item 1, Appendix C
REMOVAL
a. Loosen captive screws (1) and open cover (2) on enclosure (3).
b. Tag and disconnect electrical leads.
c.
Remove port engine remote module (20).
d. Tag and disconnect electrical power cable (4) from liquid level switch (5).
e. Tag and disconnect electrical power cable (6) from solid state switch (7).
f.
Tag and disconnect electrical power cable (8) from liquid level switch (9).
g. Tag and disconnect electrical power cable (11) from pressure switch (10).
h. Tag and disconnect electrical power cable (13) from liquid level switch (12).
i.
Tag and disconnect electrical power cable (15) from pressure switch (14).
j.
Tag and disconnect electrical power cables (16, 17, 18, 19).
REPAIR
Repair at this level of maintenance is by replacement of port engine remote module (20) and
electrical cables.
|
||