Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18
This task covers:
a. Removal
b. Repair
c. Replacement
INITIAL SETUP :
Tools
Equipment Condition
Tool kit, electrician's,
Electrical power to machinery plant
monitoring and alarm system
secured and tag 'Out of Service -
Materials/Parts
Do Not Operate." (TM 55-1905-223-10)
Warning tags, Item 1, Appendix C
LOCATION
ITEM
ACTION
REMARKS
REMOVAL
a. Loosen captive screws (1) and open cover (2, Sheet 1).
b. Tag and disconnect electrical leads.
c. Remove motor controller multi-remote module (5) from enclosure (3).
d. Tag and disconnect electrical power cable (4) from PORT STRG GEAR PUMP (17).
e. Tag and disconnect electrical power cable (13) from MCCP205 (16).
f. Tag and disconnect electrical power cable (14) from MCCP205 (15).
g. Tag and disconnect electrical power cable (6) from STBD STRG GEAR PUMP (7).
h. Tag and disconnect electrical power cable (24) from FIRE PUMP NO. 2 (27, Sheet 2).
i. Tag and disconnect electrical power cable (23) from FIRE PUMP NO. 1 (28).
j. Tag and disconnect electrical power cable (11) from F.W. PRESS PUMP NO. 2 (10, Sheet 1).
k. Tag and disconnect electrical power cable (25) from BILGE/BALLAST PUMP (26, Sheet 2).
Change 1 3-469
|
||