Custom Search
 
  
 
TM 55-1905-223-24-18-2
3-164. Replace/Repair Winch, Bow Ramp, Power Distri bution. (Figure 3-150).
This task covers:
a. Repair.
INITIAL SETUP :
Tools
Equipment Condition
Tool kit, electrician's,
Electrical power secured at ship
service switchboard and tagged "Out
of Service - Do No Operate."
Materials/Parts
Warning tag, Item 1, Appendix C
WARNING
Death, serious injury, or equipment damage can result from
contact with live electrical circuits. Before beginning work on-
this, or any other electrical equipment, turn power and control
voltage circuit breakers OFF and tag "Out of Service - Do Not
Operate."
REMOVAL
a. Remove door assembly. Refer to 240V power distribution para. 2-125 .
b. Tag and disconnect electrical power cable (P226) (T-100) (1).
c. Tag and disconnect electrical power cable (C-BR3) (M-10) (3).
d. Tag and disconnect electrical power cable (P226MOT) (T-100) (2).
e. Remove power distribution panel. Refer to 240V power distribution para. 2-125 .
REPAIR
Repair at this level of maintenance is by replacement of worn or defective parts.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business