Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
3-174. Repair Power Distribution Panel EP103. (Figure 3-159)
This task covers:
a. Repair
INITIAL SETUP
Tools
Equipment Condition
Tool kit, electrician's,
Emergency switchboard WHL/HSE/ELEX
PNL EP103 35AT circuit breaker OFF
and tagged "Out of Service - Do Not
Service." TM 55-1905-223-10.
Materials/Parts
Warning tag, Item 1, Appendix C
WARNING
Death, serious injury, or equipment damage can result from
contact with live electrical circuits. Before beginning work on
this, or any other electrical equipment, turn power and control
voltage circuit breakers OFF and tag "Out of Service - Do Not
Operate."
REPAIR
NOTE
Repair of power distribution panel EP103 is by replacement of
associated electrical cables (1 through 25).
a. Disconnect cable (1 through 25) from power distribution panel and termination point.
b. Run new cable. Attach to power distribution panel and termination point.
|
||