Custom Search
 
  
 
TM 55-1905-223-24-18-2
3-179. Repair Emergency Generator Switchboard Battery Assembly. (Figure 3-162)
This task covers:
a. Repair
INITIAL SETUP
Tools
Equipment Condition
Tool kit, electrician's,
Emergency switchboard EMERG SWBD BATT
CHGR EP1lO 40AT circuit breaker OFF
and tagged "Out of Service - Do Not.
Materials/Parts
Operate." TM 55-1905-223-10.
Warning tag, Item 1, Appendix C
WARNING
Death, serious injury, or equipment damage can result from
contact with live electrical circuits. Before beginning work on
this, or any other electrical equipment, turn power and control
voltage circuit breakers OFF and tag "Out of Service - Do Not
Operate."
REPAIR
NOTE
Repair of emergency switchboard battery assembly is by
replacement of associated electrical cables (1 through 3).
a. Disconnect cable from emergency switchboard and termination point.
b. Run new cable. Attach to power distribution panel and switchboard.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business