Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
INTERMEDIATE GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
Page
SECTION I.
Repair Parts, Special Tools; Test, Measurement, and
Diagnostic Equipment (TMDE); and Support Equipment ...................
SECTION II.
Service Upon Receipt .......................................................................
SECTION III.
Intermediate General Support Preventive Maintenance
Checks and Services
4-2
SECTION IV.
Intermediate General Support Troubleshooting Procedures ...............
SECTION V.
Intermediate General Support Maintenance Procedures ...................
SECTION VI.
Preparation for Storage or Shipment .................................................
SECTION I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT,
AND DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT
4-1. Common Tools and Equipment . For authorized common tools and equipment, refer to the Modified
Table of Organization and Equipment (MTOE) applicable to your organization.
4-2. Special Tools (TMDE), and Support Equipment . For special tools, test, measurement, and diagnostic
equipment; and support equipment, requirements are listed and illustrated in the Repair Parts and Special
Tools List (RPSTL), TM 55-1905-223-24P. These items are also listed in the Maintenance Allocation Chart
(MAC), Appendix B.
4-3. Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL),
TM 55-1905-223-24P.
SECTION II. SERVICE UPON RECEIPT
4-4. Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,
report the damage in accordance with the instructions of DA Pam 738-750.
b. Check the equipment against the packing slip to see if the shipment is complete.
Report all
discrepancies in accordance with the instructions of DA Pam 738-750.
c. Check to see whether the equipment has been modified.
|
||