Tweet |
Custom Search
|
|
|
|||||
|
|||||
TM 55-1905-223-24-18-2
(3) Install preformed packing (22) on shaft (20).
(4) Install worm wheel (13) on shaft.
(5) Install cylindrical notched pin (12) and secure worm wheel to shaft.
(6) Install gasket (14) on revolution housing (15).
(7) Position revolution housing on frame.
(8) Install three machine screws (18) and secure housing to frame.
(9) Install gasket (10) and oil drain screw (11).
f. Rubber Cushions.
NOTE
Refer to paragraph 3-17, vertical gear assembly for installation procedures of
rubber cushions and caps.
(1) Rubber cushions.
(2) Caps.
NOTE
Refer to Figure 4-6 remaining assembly procedures.
g. Gaskets.
(1) Position gasket (2) and flange (16) to underside of frame.
(2) Install two machine screws (4) and secure gasket and flange.
(3) Position gasket (15) and manifold (14) to lower ledge of frame.
(4) Install two machine screws (4) and secure gasket and manifold.
(5) Attach expansion joint (8) gasket (2) and flange (7) to gasket (12), gasket retainer (13) and
manifold (14).
(6) Install plate (10).
(7) Install two plain hex nuts and secure plate to manifold.
(8) Install clamp assembly (11).
(9) Attach gasket (2) and flange (7) to expansion joint (8).
(10) Install two machine screws and plain hex nuts and secure gasket and flange to expansion
joint.
4-22
|
|||||