Custom Search
 
  
 
TM 55-1905-223-24-3
f.
Install the hoses (13, 14, Figure 2-46) on the coolant inlet and the outlet connections (10, 20) and replace hose
clamps (12).
Tighten all hose clamps to 40 in-lb (5 N ) torque.
g.
m
h.
Install new air crossover connection gasket (6), connection (3), hose (2), and clamps (1). Tighten the
clamps to 70 in-lb (8 N ) torque.
m
i.
Fill the cooling system (Table 2-1, item 24).
j.
Remove tags and turn on electrical power. TM 55-1905-223-10.
k.
Start the engine (TM 55-1905-223-10) and check for leaks. Correct leaks as required.
2-140


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business