Custom Search
 
  
 
TM 55-1905-223-24-3
g. Install the access cover (14) and a new hand hole gasket (15) with the screws and flat washers (13).
Tighten the screws (15) to 30 to 35 ft-lb (40 to 47 N ) torque.
M
h. Place gauge rod-cap (18) into the tube (17). Turn T-handle on rod-cap (18) and on filler cap (16),
,
clockwise to secure.
i.
Install the loop clamp (9) to the nonmetallic hose assembly (8).
j.
Fill the engine with clean oil (PMCS Table 2-1, Item 15).
k.
Connect battery banks (starboard), operate air system (port), refer to TM 55-1905-223-10.
l.
Remove tags,- turn on electrical power, and operate the engine until the water temperature reaches
180 (80 ), and check for oil leaks.
F
C
3-90


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business