Tweet |
![]()
Custom Search
|
|
![]() |
||
![]() TM 55-1905-223-24-5
FIGURE 3-30. Rocker Arm Cover Torque Sequence .
s. Tighten the assembled washerscrews in each cover in the sequence shown to 15 ft-lb. (20.3 N )
m
torque (FIGURE 3-30).
t. Insert the crankcase breather (3, FIGURE 3-31) in the cover (4).
u. Install the nonmetallic hose (1) on the breather (3) with clamp (2). Tighten clamp (2).
v. Install the upper fuel line check valve (paragraph 2-33).
w. Install the intake air crossover pipe (paragraph 2-39).
x. Install the instrument panel (paragraph 2-22).
y. Prepare engine for run operation. Remove tags.
z. Start the engine and check for proper operation (TM 55-1905-223-10).
3-44
|
||
![]() |