Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-9
(a) Position sensitive switches (22) over mounting holes in bracket (27) and secure screws and nuts (24,
20).
(b) Solder electrical leads (13, 23) to switches and remove tags.
(3) Potentiometers.
(a) Position pots (26) in bracket (27). Secure with machine screws (19).
(b) Solder electrical leads (12) to pots and remove tags.
(c) Replace spring pin (7) and secure setscrew (8).
b. Straight Shaft.
(1) Lubricate preformed packing (31) and install on shaft end (25).
(2) Position spur gear (6), flat washer (5), and cams (17) in alignment before inserting shaft (25).
(3) Slide shaft through upper sleeve bearing (4), shaft collar (28), and lower bearing (16).
(4) Replace setscrew (30) into shaft collar (28), securing shaft to followup unit.
(5) Replace retaining ring (2), spring post (1), and lower gear arm (29).
(6) Replace capscrew (3) connecting gear arm to followup unit.
(7) Replace gasket (9) and access cover (11) secure screws (10) to followup unit housing (21).
(8) Replace followup unit (paragraph 2-11).
(9) Remove "Out of Service Do Not Operate" tag and restore equipment to normal operation.
3-9
|
||