Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-9
CHAPTER 4
INTERMEDIATE GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
Repair Parts, Special Tools; Test, Measurement, and
Diagnostic Equipment (TMDE); and Support Equipment............................................................... 4-1
Service Upon Receipt................................................................................................................... 4-1
Intermediate General Support Preventive Maintenance Checks
and Services (PMCS) .................................................................................................................. 4-2
Intermediate General Support Troubleshooting ............................................................................ 4-2
Intermediate General Support Maintenance Procedures............................................................... 4-3
Preparation for Storage or Shipment .......................................................................................... 4-24
Section I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT, AN DIAGNOSTIC EQUIPMENT (TMDE);
AND SUPPORT EQUIPMENT
4-1. Common on Tools and Equipment. For authorized common tools and equipment refer to the Modified Table of
Organization and Equipment (MTOE) applicable to your organization.
4-2. Special Tools, TMDE, and Support Equipment. Special tools; test, measurement, and diagnostic equipment; and
support equipment requirements are listed and illustrated in the Repair Parts and Special Tools List (RPSTL), TN 55-
1905-223-24P. These items are also listed in the Maintenance Allocation Chart (MAC), Appendix B of this manual.
4-3. Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL), TM 55-
1905-223-24P.
Section II. SERVICE UPON RECEIPT
4-4. Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred, during shipment. If the equipment has been damaged, report the
damage in accordance with the instructions of DA Pam 738-750.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of DA Pam 738-750.
c. Check to see whether the equipment has been modified.
d. Remove protective caps, plugs, inserts, wrappings and tape when inspection/delivery is completed. Inspect
piping openings for damage. Wipe off dirt, grease, or protective film at time of installation.
Change 1 4-1
|
||