Custom Search
 
  
 
TM 55-1905-242-14
0022 00
RAW WATER COOLING SYSTEM
Prepare the raw water cooling system as follows:
1.
Ensure that the following strainers are clean and intact:
a.
Propulsion engine (16).
16
b.
Air conditioning/heating (17).
c.
Fire pump (18).
d.
Generator engine (19).
2.
OPEN the following seacocks:
a.
Propulsion engine (20).
20
b.
Air conditioning (21).
c.
Fire pump (22).
d.
Generator engine (23).
0022 00-5


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business